How we prove the part
Nothing ships on a feeling. Dimensions come off the CMM, surface finish off a calibrated profilometer, and both go out with the part.
ISO 9001:2015
Quality management system certified and audited.
AS9100D
Aerospace quality management system certified and audited: process sheets, control plans, configuration control and part traceability are all in place and operating on every job.
CMM inspection for other manufacturers
The measuring room is also available as a service: third-party CMM inspection, GD&T verification and AS9102 reports for parts made elsewhere in Hyderabad. CMM inspection services.
Traceability
Material test certificates, heat and batch identity, operator and machine records, and inspection results are held against every job number and retained.
Calibration
All measuring equipment is on a calibration schedule traceable to national standards, with certificates on file and status verified before a first article is signed.
| Instrument | Capacity or resolution |
|---|---|
| Zeiss Spectrum Verity Coordinate measuring machine |
900 × 1200 × 600 mm |
| Zeiss Handysurf+ Surface roughness tester, diamond stylus |
−210 to +160 µm 0.0007 µm |
| Optomech VMM 2515 Video measuring machine |
250 × 150 mm |
| Hand metrology Micrometers, bore, height and slip gauges |
Calibrated, traceable |
The documentation pack
Tell us at enquiry stage which of these your goods-inward needs, and they are priced in from the start. Tick them on the quotation form and nothing gets missed.
| Document | What it contains | Availability |
|---|---|---|
| Dimensional report | Measured values against drawing nominals and limits, from the Zeiss CMM | Standard |
| Certificate of conformance | Declaration against the drawing number and revision, signed | Standard |
| Material test certificate | Mill certificate for the heat used, filed against the job number | Standard |
| AS9102 first article | Forms 1, 2 and 3 with a ballooned drawing | On request |
| Surface roughness record | Ra values measured on a calibrated profilometer | On request |
| GD&T verification | Position, profile, runout and form evaluated on the CMM | On request |
| In-process inspection records | Stage checks recorded through the route card | On request |
| Hardness test report | Post heat-treatment verification | On request |
| NDT report | Dye penetrant, MPI, ultrasonic or radiography via approved sources | On request |
| PPAP documentation | Production part approval pack to the level you specify | On request |
Where inspection sits in the route
Not one check at the end. Four points, defined in the control plan before the job starts.
Incoming
Material verified against the certificate and the specification on the drawing before it is cut.
First-off
First article measured and signed before the batch is released to run.
In-process
Stage checks at the points where the material or the setup is most likely to move.
Final
Full dimensional inspection on the CMM, plus finish and documentation, before dispatch.
When something goes wrong
It will, eventually, in any shop that tells you the truth. What matters is what happens next.
Contain
Non-conforming parts are quarantined in a defined area and cannot re-enter the flow. If a batch has already shipped, you hear from us before you find it.
Report
You get the measurements, the deviation, and a written root-cause analysis — not a phone call saying it was a one-off.
Correct
Corrective action is recorded against the job, the control plan is updated, and the change is verified on the next batch before we call it closed.
Send the drawing. Get a price in 24 hours.
Tell us the material, the quantity, the tightest tolerance on the print and which inspection documents you need. We come back inside one working day with feasibility, price and a date.